Basement Construction. You Need A Soil Report.

The best advice available on the regulations surrounding a basement,the "Approved Document - Basements For Dwellings", has this to say about it:





Note all the details it recommends. We agree, everything listed is essential knowledge. It will cost you dear to construct a basement without any part of it.
  • Be in no doubt. The more thorough the investigation, the less risk you face.

  • The earlier you have your investigation the more you will save on design and materials.

  • Without an investigation, over-engineering becomes a necessity and over-engineering costs ten times an investigation.

  • The investigation has always proven to be money well spent. Spend more on this research, not less, to bring your project cost down.

  • One borehole cannot tell you how different strata slope unseen below ground. 3 boreholes is a sensible minimum.

Imagine if you dug the hole, found a problem that you could not afford to overcome and then had to buy in material (say, £150 for each sq m dug and filled) to fill the hole again.

With or without an investigation, your structural engineer's calculations have to be accepted by building control before work starts. If there are no figures for soil stability he will need to specify extra excavation, extra concrete, a lot of extra steel and probably unnecessary complication in case the ground turns out to be very poor.

We have known this to be six times the steel costing six times to fix: £30,000 instead of £5,000.

If you aren't fully aware of the ground water levels and the speed water drains away:
(a) in summer,
(b) in winter and
(c) after heavy rain
you cannot choose the right waterproofing solution.

External drainage is often the cheapest waterproofing measure, but to rely upon it when it cannot cope at all times is a serious error. In flooded conditions drainage pipes deliver rain water to your basement superfast, instead of taking it away.


The people who do these investigations are a bit hard to find. They seem to call themselves Geotechnical Engineers or Engineering Geologists but Yellow Pages doesn't. Yellow Pages hides them. There is an Association of Geotechnical and Geoenvironmental Specialists (AGS) who list their members. You will probably need to do some internet searching to find specialists in your local area.

Therefore we have listed a number down the page. We have had a report by each of them sent us by clients.

This link opens a university page and describes their processes in a rather more formal way than I do below.


Case Studies.

One.

The Moonstone Project near Cheltenham re-used the quality stone it excavated.




Two.

The owner of this house near Silverstone dug a few feet and found dry sand and stones - perfect. So he went ahead.



Then it got worse.



The land is near the top of a hill and one layer was a 'lens' holding perched water. Until the ground was dug, water flowed through the lens down the hill. After the hole was dug, the hole filled with water instead.



It was unfortunate that the house was on the lowest point of this large area of land so everywhere down hill belonged to someone else. He couldn't lay a pipe.

The only solution was to go down to draining material.

A crater was dug for the digger, then a trench. Still clay. The crater was enlarged and another trench dug.



The digger found sandstone in his third crater. That is, after his crater was 8m deep and 20m wide. I took this photo from ground level.



This customer had the space to cope with this much soil. Perhaps the operation cost £15,000. If he had to remove all the material in lorries then bring it back it may have cost 3 times that.

But if he'd had a proper investigation (say £3,000) at the beginning he would have chosen a bore hole soakaway for, say £2,000 instead of carrying on the way he did with his fingers crossed.

That final trench was filled with big stones to create a soakaway and a drainage test undertaken.

Soakaways have to be at least 5m from the house and the level that the water goes in has to be 1m lower than the basement floor slab.




Three

This owner, near Oxford, dug some way with his mini digger finding loose limestone until 1.5m when it turned to rock he couldn't get through.

He decided to hire a sufficiently large machine with a monty (hydraulic) breaker.



It took some time but the excavation was completed and the basement built.

5m from the basement he went extra deep, and right through the rock, to create a soakaway.

He got through the first winter without a roof so naturally he expected the basement to be full of rain water.

But during the second winter he pumped the basement out and found water coming in at waist level. Apart from the issues concerning leaks, his soakaway wasn't working. Why? Most probably the water level rose during winter, through the hole he created and flooded the whole area whereas previously the water couldn't come up through the rock.

A nightmare, yet a geologist could have known all this before he began and drainage could have gone down the slope instead.

(In fact, his vibrating poker had failed on the day of the wall pour so the concrete was not properly compacted, which will be why he had leaks. But he was insured by NHBC who insist on internal drainage anyway and I understand that in the end he had to have internal drainage professionally fitted to get his NHBC warranty and it cost him an extra £8,000).


Four.

At Stow on the Wold the ground was a dream. Simple to dig, the sides held up and the bottom was free draining. In these before and after photos you can see that the spoil was good enough to be stockpiled 40m away and brought back to generally raise the ground level around the house. If they hadn't known they could re-use it, they may have dug deeper and paid for all the material to be taken away.







Sloping ground.

Five.

This basement was one of many on a bit of a slope. It has a ditch some way away at a lower level than the basement. The drainage around the basement perimeter was laid away at a shallower slope than the land so that it conveniently discharged into the ditch.



The sand at Weybridge was taken away at cost to be sold as reject sand while the sand left behind was susceptible to being washed away by storms. Apparently the next door neighbours down the slope found no sand when they dug a pool. That demonstrates how soil types quickly vary.




The point is that if you go ahead with your excavation before you have detailed knowledge about what is down there (or if you choose not to act upon that knowledge), you might come across a problem you cannot afford to overcome or even make good.

But if you find out good quality information in good time then the chances are your structural engineer can make use of that information and design accordingly, saving you money. You might even save money on muck away too.

We would suggest that the average professional soil report costs about £2500 while the average structural engineer might cost up to half that if he is just designing a basic basement. That total of £4000 is very quickly exceeded by any over-design or mistakes.

A good quality soil report gives everyone the chance to save you money. It's cost is negligible against the greater costs of engineer, excavation, muck away, concrete and reinforcing steel.

Full Soil Investigation Report

The full report relies upon boreholes being drilled and samples taken and tested professionally as well as the desk research.

A good soil report will provide information useful to your excavation sub contractor as well. It will reduce his risk and might enable him to be cheaper.

Exploratory work reduces risk. It is money well spent.

Below is a sample borehole log from a professional soil investigation company. The SPT N is a measure of the soil's density. By pushing into the soil in a specified manner the ground's bearing capacity is ascertained.



This soil is sort of average until you see that it is on chalk which is very freely draining. Advantageous for a basement since the structure should never suffer from huge sideways pressure from water.


In this second extract (from a different log), you see that they found water at 2.30m and that their hole filled up to just 1.16m by the end of the day.



In the accompanying written report, they recommended 10m deep piles to support a house structure. Although building a basement in this water might cost 20% more, built properly, even in poor ground, it becomes the foundation for everything and saves the cost of the piling.


Some soil investigation companies whose reports have been passed to us:

Albury S.I. Ltd, Godalming, Surrey, 01428 684836

Constructive Evaluation Ltd, Chichester, Sussex, 01243 533499. This company appears to have several offices.

Geo-Environmental Services Ltd, Brighton, 01273 699399

Ground Engineering, Peterborough, Cambs, 01733 566566

Herts and Essex Site Investigations, Ware, 01920 822233

Listers Geotechnical Consultants, Towcester, Northants, 01327 860060. This company appears to have several offices.

MiniSoils Ltd. This company appears to have several offices.
Cheshire, 0161 980 0044.
Bath, 01225 425657

Soil Consultants, High Wycombe, 01494 712494

Southern Testing, East Grinstead, 01342 333100

Structural Soils Ltd, Bristol, 0117 947 1000.

Also I have seen a report by Groundesign which was very good. Groundesign are in Belfast whereas the project surveyed was in Buckinghamshire, so i do not know the arrangements. Their telephone number is 02890 280887



basement construction menu page   At the foot of every page you will find this image. Click it to go to our menu page where every page is listed and described.

Clicking the banner at the top will return you to the home page.


 Previous Page

How Much Energy Will a Basement Save You?
 

 Next Page

basement structural engineer
 

 The Page After That

Please Ask Your Architect To Read This Page




For specific information on waterproofing concrete and waterproof concrete structures go to our other web site

waterproof concrete